Resumos automáticos gerados a partir do regulamento do PDM de Loures, com os artigos citados. Podem conter erros — confirme sempre o texto oficial do plano.
Espaço Habitacional
Zona: Solo Urbano-Espaços Residenciais-Habitacionais a Reestruturar, Solo Urbano, Espaços Residenciais, Habitacionais a Reestruturar, Espaço Habitacional · fonte: regulamento do PDM · resumo automático (modelo gpt-5.4-mini)
Key building parameters found:
- predominant residential use share: above 50 % of the floor area
- (non-subdivision operations) maximum buildability index: 0,70
- (non-subdivision operations) minimum permeability index: 0,25
- (non-subdivision operations) maximum occupation index: 50 %
- (non-subdivision operations) maximum façade height: a das áreas urbanas envolventes
- (subdivision, absence of urbanisation plan or detailed plan) maximum buildability index: 0,70
- (subdivision, absence of urbanisation plan or detailed plan) minimum permeability index: 0,25
- (subdivision, absence of urbanisation plan or detailed plan) maximum occupation index: 50 %
- (subdivision, absence of urbanisation plan or detailed plan) maximum façade height: a das áreas urbanas envolventes
- (subdivision, full tertiary use) maximum buildability index: 0,80
- (subdivision, industrial/logistics/micrologistics/waste management use) volumetric index: 5 m3/m2
- (existing legal industries) increase over the volumetric index: 15 %
- (non-subdivision operations) maximum buildability index: 0,80
- (subdivision, absence of urbanisation plan or detailed plan) maximum buildability index: 0,80
- buildability index increase in boundary areas: up to 25 %
- maximum buildability index (urban perimeters level I and II): 1,50
- maximum buildability index (remaining urban perimeters): 0,70
- minimum permeability index: 0,25
- maximum façade height: a das áreas urbanas envolventes
- (A1) maximum buildability index: 2
- (A1) maximum number of floors above threshold level: 6
- (A) maximum buildability index: 1,50
- (A) maximum number of floors above threshold level: 6
- (B1) maximum buildability index: 1,25
- (B1) maximum number of floors above threshold level: 6
Article 12 (Article 69): In habitational areas to be restructured, housing use is predominant over other admissible uses, at a percentage above 50 % of the floor area. The article also states that other admissible uses are listed in the following number.
- predominant residential use share: above 50 % of the floor area
Article 69 (Article 69): In habitational areas to be restructured, housing use is predominant over other admissible uses, at a percentage above 50 % of the floor area. The remaining admissible uses are listed, but no further parameters are given in this fragment.
- predominant residential use share: above 50 % of the floor area
Article 16 (Article 78): For operations that do not result from subdivision, the project must respect the morphology and typology of the urban fabric, including the modal façade height, volume and plot occupation. In the absence of a urbanisation plan or detailed plan, new subdivision operations must comply with: maximum buildability index 0,70; minimum permeability index 0,25; maximum occupation index 50 %; maximum façade height equal to the surrounding urban areas, unless technical specificity requires a higher height. For subdivision with full tertiary use, the maximum buildability index is 0,80. For subdivision with industrial, logistics or micrologistics use and waste-management operations, the index in paragraph 2(a) is replaced by volumetric index 5 m3/m2. Existing legal industries may obtain a 15 % increase over that volumetric index, with the remaining paragraph 2 parameters as recommendation, under stated conditions. Buildings existing before 1994 that exceed the parameters may be exempted if technically justified.
- (non-subdivision operations) maximum buildability index: 0,70
- (non-subdivision operations) minimum permeability index: 0,25
- (non-subdivision operations) maximum occupation index: 50 %
- (non-subdivision operations) maximum façade height: a das áreas urbanas envolventes
- (subdivision, absence of urbanisation plan or detailed plan) maximum buildability index: 0,70
- (subdivision, absence of urbanisation plan or detailed plan) minimum permeability index: 0,25
- (subdivision, absence of urbanisation plan or detailed plan) maximum occupation index: 50 %
- (subdivision, absence of urbanisation plan or detailed plan) maximum façade height: a das áreas urbanas envolventes
- (subdivision, full tertiary use) maximum buildability index: 0,80
- (subdivision, industrial/logistics/micrologistics/waste management use) volumetric index: 5 m3/m2
- (existing legal industries) increase over the volumetric index: 15 %
Article 78 (Article 78): For operations that do not result from subdivision, the project must respect the morphology and typology of the urban fabric, including the modal façade height, volume and plot occupation. In the absence of a urbanisation plan or detailed plan, new subdivision operations must comply with: maximum buildability index 0,70; minimum permeability index 0,25; maximum occupation index 50 %; maximum façade height equal to the surrounding urban areas, unless technical specificity requires a higher height. For subdivision with full tertiary use, the maximum buildability index is 0,80. For subdivision with industrial, logistics or micrologistics use and waste-management operations, the index in paragraph 2(a) is replaced by volumetric index 5 m3/m2. Existing legal industries may obtain a 15 % increase over that volumetric index, with the remaining paragraph 2 parameters as recommendation, under stated conditions. Existing buildings before 1994 that exceed the parameters may be exempted if technically justified.
- (non-subdivision operations) maximum buildability index: 0,70
- (non-subdivision operations) minimum permeability index: 0,25
- (non-subdivision operations) maximum occupation index: 50 %
- (non-subdivision operations) maximum façade height: a das áreas urbanas envolventes
- (subdivision, absence of urbanisation plan or detailed plan) maximum buildability index: 0,70
- (subdivision, absence of urbanisation plan or detailed plan) minimum permeability index: 0,25
- (subdivision, absence of urbanisation plan or detailed plan) maximum occupation index: 50 %
- (subdivision, absence of urbanisation plan or detailed plan) maximum façade height: a das áreas urbanas envolventes
- (subdivision, full tertiary use) maximum buildability index: 0,80
- (subdivision, industrial/logistics/micrologistics/waste management use) volumetric index: 5 m3/m2
- (existing legal industries) increase over the volumetric index: 15 %
Article 17 (Article 87): For operations that do not result from subdivision, the project must respect the morphology and typology of the surrounding urban fabric, including the modal façade height, volume and plot occupation. In the absence of a urbanisation plan or detailed plan, subdivision operations must comply with maximum buildability index 0,80 and maximum façade height equal to the surrounding urban areas. If those conditions cannot be verified, the regime of article 60(3) must be followed.
- (non-subdivision operations) maximum buildability index: 0,80
- (non-subdivision operations) maximum façade height: a das áreas urbanas envolventes
- (subdivision, absence of urbanisation plan or detailed plan) maximum buildability index: 0,80
- (subdivision, absence of urbanisation plan or detailed plan) maximum façade height: a das áreas urbanas envolventes
Article 87 (Article 87): For operations that do not result from subdivision, the project must respect the morphology and typology of the surrounding urban fabric, including the modal façade height, volume and plot occupation. In the absence of a urbanisation plan or detailed plan, subdivision operations must comply with maximum buildability index 0,80 and maximum façade height equal to the surrounding urban areas. If those conditions cannot be verified, the regime of article 60(3) must be followed.
- (non-subdivision operations) maximum buildability index: 0,80
- (non-subdivision operations) maximum façade height: a das áreas urbanas envolventes
- (subdivision, absence of urbanisation plan or detailed plan) maximum buildability index: 0,80
- (subdivision, absence of urbanisation plan or detailed plan) maximum façade height: a das áreas urbanas envolventes
Article 9 (Article 60): The municipality may delimit a unit of execution in consolidated areas where there is interest in urban structuring or restructuring, including general infrastructures, equipment, green spaces, removal of degradation focal points, and socio-territorial cohesion. In areas to be restructured, where there is no detailed plan, urban operations must be preceded by a unit of execution or an ORU, except in AUGI cases meeting the stated conditions. Where the unit of execution is dispensed with, operations follow the regime of adjacent consolidated areas of the same qualification. In boundary areas next to equipment or leisure/green spaces, a 25 % increase in the land buildability index may be admitted under the stated conditions.
- buildability index increase in boundary areas: up to 25 %
Article 60 (Article 60): The municipality may delimit a unit of execution in consolidated areas where there is interest in urban structuring or restructuring, including general infrastructures, equipment, green spaces, removal of degradation focal points, and socio-territorial cohesion. The article also mentions works of conservation and alteration, colmation situations, contiguity with consolidated space, and single operations covering the whole restructured polygon. In areas to be restructured, where there is no detailed plan, urban operations must be preceded by a unit of execution or an ORU. Where dispensed, they follow the regime of adjacent consolidated areas of the same qualification. In boundary areas next to equipment or leisure/green spaces, a 25 % increase in the buildability index may be admitted under the stated conditions.
- buildability index increase in boundary areas: up to 25 %
Artigos do regulamento citados
- Art. Article 12 — Article 69In habitational areas to be restructured, housing use is predominant over other admissible uses, at a percentage above 50 % of the floor area. The article also states that other admissible uses are listed in the following number.
- Art. Article 69 — Article 69In habitational areas to be restructured, housing use is predominant over other admissible uses, at a percentage above 50 % of the floor area. The remaining admissible uses are listed, but no further parameters are given in this fragment.
- Art. Article 16 — Article 78For operations that do not result from subdivision, the project must respect the morphology and typology of the urban fabric, including the modal façade height, volume and plot occupation. In the absence of a urbanisation plan or detailed plan, new subdivision operations must comply with: maximum buildability index 0,70; minimum permeability index 0,25; maximum occupation index 50 %; maximum façade height equal to the surrounding urban areas, unless technical specificity requires a higher height. For subdivision with full tertiary use, the maximum buildability index is 0,80. For subdivision with industrial, logistics or micrologistics use and waste-management operations, the index in paragraph 2(a) is replaced by volumetric index 5 m3/m2. Existing legal industries may obtain a 15 % increase over that volumetric index, with the remaining paragraph 2 parameters as recommendation, under stated conditions. Buildings existing before 1994 that exceed the parameters may be exempted if technically justified.
- Art. Article 78 — Article 78For operations that do not result from subdivision, the project must respect the morphology and typology of the urban fabric, including the modal façade height, volume and plot occupation. In the absence of a urbanisation plan or detailed plan, new subdivision operations must comply with: maximum buildability index 0,70; minimum permeability index 0,25; maximum occupation index 50 %; maximum façade height equal to the surrounding urban areas, unless technical specificity requires a higher height. For subdivision with full tertiary use, the maximum buildability index is 0,80. For subdivision with industrial, logistics or micrologistics use and waste-management operations, the index in paragraph 2(a) is replaced by volumetric index 5 m3/m2. Existing legal industries may obtain a 15 % increase over that volumetric index, with the remaining paragraph 2 parameters as recommendation, under stated conditions. Existing buildings before 1994 that exceed the parameters may be exempted if technically justified.
- Art. Article 17 — Article 87For operations that do not result from subdivision, the project must respect the morphology and typology of the surrounding urban fabric, including the modal façade height, volume and plot occupation. In the absence of a urbanisation plan or detailed plan, subdivision operations must comply with maximum buildability index 0,80 and maximum façade height equal to the surrounding urban areas. If those conditions cannot be verified, the regime of article 60(3) must be followed.
- Art. Article 87 — Article 87For operations that do not result from subdivision, the project must respect the morphology and typology of the surrounding urban fabric, including the modal façade height, volume and plot occupation. In the absence of a urbanisation plan or detailed plan, subdivision operations must comply with maximum buildability index 0,80 and maximum façade height equal to the surrounding urban areas. If those conditions cannot be verified, the regime of article 60(3) must be followed.
- Art. Article 9 — Article 60The municipality may delimit a unit of execution in consolidated areas where there is interest in urban structuring or restructuring, including general infrastructures, equipment, green spaces, removal of degradation focal points, and socio-territorial cohesion. In areas to be restructured, where there is no detailed plan, urban operations must be preceded by a unit of execution or an ORU, except in AUGI cases meeting the stated conditions. Where the unit of execution is dispensed with, operations follow the regime of adjacent consolidated areas of the same qualification. In boundary areas next to equipment or leisure/green spaces, a 25 % increase in the land buildability index may be admitted under the stated conditions.
- Art. Article 60 — Article 60The municipality may delimit a unit of execution in consolidated areas where there is interest in urban structuring or restructuring, including general infrastructures, equipment, green spaces, removal of degradation focal points, and socio-territorial cohesion. The article also mentions works of conservation and alteration, colmation situations, contiguity with consolidated space, and single operations covering the whole restructured polygon. In areas to be restructured, where there is no detailed plan, urban operations must be preceded by a unit of execution or an ORU. Where dispensed, they follow the regime of adjacent consolidated areas of the same qualification. In boundary areas next to equipment or leisure/green spaces, a 25 % increase in the buildability index may be admitted under the stated conditions.
- Art. Article 13 — Article 70In the absence of a urbanisation plan or detailed plan, subdivision operations must comply with: maximum buildability index 1,50 for urban perimeters of levels I and II, and 0,70 for the remaining urban perimeters; minimum permeability index 0,25; and maximum façade height equal to the surrounding urban areas. For other urban operations, article 64(1) applies.
- Art. Article 70 — Article 70In the absence of a urbanisation plan or detailed plan, subdivision operations must comply with: maximum buildability index 1,50 for urban perimeters of levels I and II, and 0,70 for the remaining urban perimeters; minimum permeability index 0,25; and maximum façade height equal to the surrounding urban areas. For other urban operations, article 64(1) applies.
- Art. Article 14 — Article 73In subdivision and AUGI reconversion operations assigned to types A1, A, B1 and B, the proposed solution must be justified in terms of urban design, integration, urban enhancement, and the requirements of the specific legal reconversion framework. For types E and F, the maximum number of floors above the threshold level must be justified under cumulative conditions. The table fixes maximum buildability index and maximum number of floors above threshold level by type: A1 2 and 6 floors; A 1,50 and 6; B1 1,25 and 6; B 1 and 6; C 0,80 and 4; D 0,60 and 4; E 0,45 and 3; F 0,30 and 3.
- Art. Article 14 — Article 73In subdivision and AUGI reconversion operations assigned to types A1, A, B1 and B, the proposed solution must be justified in terms of urban design, integration, urban enhancement, and the requirements of the specific legal reconversion framework. For types E and F, the maximum number of floors above the threshold level must be justified under cumulative conditions. The table fixes maximum buildability index and maximum number of floors above threshold level by type: A1 2 and 6 floors; A 1,50 and 6; B1 1,25 and 6; B 1 and 6; C 0,80 and 4; D 0,60 and 4; E 0,45 and 3; F 0,30 and 3.